Aditya, Chandra Putra Sebaya (2024) PKL II PROSES PRODUKSI DAN PERALATAN UTILITAS DI PKS RAMBUTAN PT. PERKEBUNAN NUSANTARA IV REGIONAL 1. Internship report II thesis, Politeknik LPP Yogyakarta.
PKL II_Aditya Chandra Putra Sebaya_2102035 (2).pdf - Published Version
Restricted to Registered users only
Download (5MB)
| Item Type: | Thesis (Internship report II) |
|---|---|
| Creators: | Creators NIM/NIDN Aditya, Chandra Putra Sebaya 21.02.035 |
| Contributors: | Contribution Contributors NIDK/NIDN Thesis advisor Aris, Sandi, S.ST., M.Eng. 0516089001 Thesis advisor Farhan, As'ari, S.Pd., M.Pd 0516058801 |
| Corporate Creators: | PKS RAMBUTAN PT. PERKEBUNAN NUSANTARA IV REGIONAL 1 TEBING TINGGI SUMUT |
| Uncontrolled Keywords: | utilitas pabrik sawit |
| Subjects: | 600 – Teknologi (Ilmu Terapan) > 620 Ilmu teknik dan ilmu yang berkaitan > 620 Ilmu teknik dan ilmu yang berkaitan |
| Thesis Strata: | Diploma IV |
| Divisions: | DIV Teknologi Rekayasa Mesin Industri Perkebunan |
| Depositing User: | ADITYA CHANDRA PUTRA SEBAYA |
| Date Deposited: | 11 Jun 2025 07:04 |
| Last Modified: | 11 Jun 2025 07:04 |
| URI: | https://repository.polteklpp.ac.id/id/eprint/6487 |

